- Generally after clearing al the blocking validation we will perform EOD(End Of Day) in DOP Finacle.
- EOD in DOP Finacle is of three steps
- HSCOD
- HSOLCOP
- HSCOLD
HSCOD:-
- This is the first step in EOD operation which includes the following SOL Status they are
- PRECODDONE
- CHANGE OF DATE INITIATED
- SOL DATE CHANGED
- POSTCOD DONE
HSOLCOP
- This is the second step in EOD operation which includes the SOL Status as
- SOL CLOSURE BATCH JOB DONE
HSCOLD
- This is the third and final step in EOD operation which include the SOL Status as
- SOL CLOSURE DONE
- For all steps EOD event status should be "
- But we will face some of the techincal issues while performing the said three steps and corrective measures are mentioned below
Issues faced in First step of EOD and corrective action at Office level:
Based on SOL status Inquiry report ( Menus- HSSI / EODMON) as detailed below, correction action to be taken as noted against each
SOL Status
|
Closure status
|
EOD event Status
|
Action to be done by Supervisor / System Admin / EOD user
|
PRECOD DONE
|
Failed
|
EOD event not in progress
|
(1) Check for pending transactions in HFTI ( transactions), HAFI ( Account opening), HIMC ( Inventory authorisation), HICHB ( Inventory - Issue of cheque book), HMICZ (Inward clearing zone) and clear them (2) Alternatively, Invoke HPR menu with the same user who executed HSCOD and check for validation report to know the blocking validations or failure reason (3) After clearing pending transaction, EOD user has to rerun HSCOD
|
PRECOD DONE / POSTCOD DONE
|
SCOD running for unusual time
|
Report the matter to CPC
| |
DATE CHANGED
|
EOD event not in progress
|
Rerun HSCOD with tick mark at "Run only post date batch jobs"
|
Issues faced in 2nd and 3rd step of EOD execution and corrective action at CPC level:
Based on SOL status Inquiry report ( Menus- HSSI / EODMON)as detailed below, correction action to be taken as noted against each
SOL Status
|
EOD event Status
|
Action to be done by CPC
|
PRECOD DONE / POSTCOD DONE
|
SCOD running for unusual time
|
Report the matter to EOD support team of Infosys with EODMON screenshot of respective office
|
POSTCOD DONE / SOL CLOSURE BATCH JOB DONE
|
SOLCOP running for unusual time
|
Report the matter to EOD support team of Infosys with EODMON screenshot of respective office
|
SOL CLOSURE BATCH JOB DONE
|
Failed
|
Check HPR of EOD user for failure report. CPC can rerun HSCOLD and regenearate failure report. If any unverified transaction exist, report to EOD Support team of Infosys / CEPT for unblocking
|
SOL CLOSURE BATCH JOB DONE
|
Failed
|
Check HPR of EOD user for failure report. If failure is because of not executing of PSSCD / any other batch job, report the matter to EOD support team of Infosys
|
SOL CLOSURE BATCH JOB DONE
|
EOD event not in progress and Not running HSCOLD
|
Check HPR of EOD user for failure report. If failure is because of " Processes logged on with previous date". Use HSAC
|
SOL CLOSURE BATCH JOB DONE / SOL CLOSURE DONE
|
SCOLD running for longer time
|
Report the matter to EOD support team of Infosys with EODMON screenshot of respective office
|
No comments: